Guides
The documents UK trades get asked for, explained
What each document is, what the law and HSE actually say, a structure you can copy, and a real example. Every legal statement links to its source.
For trades and contractors
RAMS template
A RAMS template for UK trades: what a risk assessment and method statement must contain, section by section, with a structure you can copy.
Read the guide →
Method statement template
How to write a method statement: the three parts, how to sequence the steps, and a structure to copy. Written for UK trades and small contractors.
Read the guide →
Method statement example
A worked method statement example for a UK trade job, with a checklist for judging any example and advice on adapting one to your own work.
Read the guide →
Risk assessment and method statement
How a risk assessment and a method statement work together, what the law asks for, and how to score risk before and after controls on a 5x5 grid.
Read the guide →
Health and safety policy template
Who needs a written health and safety policy, what HSE says it should cover, and a structure to copy for a small business.
Read the guide →
Health and safety policy statement
What a health and safety policy statement (statement of intent) says, who should sign it, how it differs from the full policy, and wording to start from.
Read the guide →
COSHH assessment template
How to write a COSHH assessment: what the Regulations require, what to take from the safety data sheet, and a structure to copy for each substance.
Read the guide →
Construction phase plan template
Who writes a construction phase plan under CDM 2015, when, and what it should cover, with a proportionate structure for small projects.
Read the guide →
For site owners, estates and FM teams
Contractor management
Managing contractors on your premises: what the law asks of site owners, HSE's five stages, approval checks, and controlling each job.
Read the guide →
Permit to work template
What a permit to work is, when HSE says you need one, what it should contain, and how to issue and close one out. With a structure to copy.
Read the guide →
Site induction template
What a contractor site induction should cover, what the law says you must tell visiting workers, and how to check they understood it.
Read the guide →
Asbestos register for contractors
The duty to manage asbestos for building owners: what the register should contain and what contractors must be told before work starts.
Read the guide →