Kompliant Estates · for retail estates, FM teams, landlords, schools and offices

Every contractor on your sites.
Checked before they arrive.

Approve contractors once. Raise a work request, and they send back their RAMS and who's coming. Kompliant checks every document against the job you actually described and your site's own information, each operative does your site induction on their phone, and you issue the permit.

  • ✓Contractors don't pay or need an account
  • ✓Works on any phone
  • ✓Built for UK sites

PTW-0007

Replace emergency lighting in the stockroom

Example Meadowhall · Example Electrical Ltd

Ready to review

Fit to this job

72/100

Operatives inducted

1 of 2

  • ✓Scope: 14 emergency lights, stockroom and rear corridor
  • ✓Out of hours, 22:00–06:00, matches the request
  • !Electrical isolation: board not named (DB1 stockroom)
  • ✕Asbestos: AIB ceiling tiles in your register not addressed
  • ✓COSHH assessment for the contact cleaner
Issue permitAsk for changesReject

Early access. Kompliant Estates is being built with a small group of estates and FM teams. Book a call to be one of them.

Are you the contractor? See Kompliant for trades →

The problem

You're responsible for who works in your buildings. Most of the checking happens by email.

Insurance in an inbox

Certificates arrive by email, get saved somewhere, and expire without anyone noticing.

RAMS nobody has time to read

A 40-page document for a two-hour job. Often last month's, with another site's name in it.

Permits on paper

Store managers find out who's coming when they walk through the door.

How it works

Approve once. Check every job.

  1. 1

    Approve your contractors

    Send one link. They upload insurance, accreditations and their operatives' cards, and sign your policies. Kompliant reads the expiry dates and cover, and flags anything expired or below your minimums.

  2. 2

    Raise a work request

    Pick the site, describe the job, the dates and the permits needed, and choose what they must send back. The site's asbestos register, EICR and drawings go with it.

  3. 3

    Check their documents against the job

    They send their RAMS, COSHH and who's coming. Kompliant checks each document against your job and your site's own information, and drafts the comments if anything's missing.

  4. 4

    Induct, issue, close

    Each operative does your site induction and a short quiz on their phone. You issue the permit; the store sees who's coming; the contractor closes it with photos.

Your buildings, on file

Every site's asbestos register, EICR and drawings, in front of every contractor.

Upload each site's documents once. Kompliant reads them and pulls out what a contractor needs: where the asbestos is, the EICR result and when it's next due, the fire risk assessment's actions. Record what isn't written down anywhere, like where the main isolation is, or that a building has no asbestos. You choose what's shared; contractors see it with every job, and opening a document is recorded.

Example Meadowhall · site file

  • Asbestos registerManagement survey · Apr 2023Shared
  • EICRSatisfactory · next due Nov 2026Due soon
  • Fire risk assessmentModerate · Jan 2025Office only
  • Lighting layoutDrawing · Feb 2021Shared

Building information

Asbestos present: AIB tiles over the stockroom (labelled)

Main isolation: intake cupboard by the rear fire exit

Fragile roof lights · access by the plant room hatch

What you get

Built for the client side. Free for your contractors.

Approved contractor register

Cleared, check or not cleared against your minimum cover and expiry dates.

Document check against the job

RAMS, a separate RA and MS, COSHH, lifting plans: checked against what you asked for, not just whether they read well.

Site inductions with a quiz

Written from your site's details, passed on a phone, valid for as long as you set. No pass, no permit.

Permits to work

Numbered permits with conditions, named operatives and a close-out with photos.

Who's on site today

Every live permit across your estate on one screen, on a desktop or a phone.

A record of every decision

Who asked, what was sent, what Kompliant flagged, who approved it and when.

21:585G

Example Retail Ltd

Permit to work · live

PTW-0007

Emergency lighting, stockroom

Tonight 22:00–06:00 · Electrical isolation · Work at height

Named: Chris E., Dev E.

✓ Chris E. · induction passed

✓ Dev E. · induction passed

Site information
Asbestos register · EICR · Lighting layout
Close the permit

Retail and leisure estates

Head-office FM with stores and contractors across the UK.

FM providers

Managing contractors on clients' sites on their behalf.

Schools and offices

Business managers and estates teams with regular contractors.

Landlords and agents

Centre and property managers approving tenants' contractors.

A named person decides

Kompliant's check helps your reviewer; it never approves anything on its own. Every permit is issued by a person, and their name and the time are recorded.

Your data stays yours

Each company's sites, contractors and documents are kept separate from every other company's. The Privacy Notice sets out what we hold and why.

See it on one of your own jobs.

Book 20 minutes. Send us a recent contractor RAMS and the job it was for, and we'll show you the check.

Or email hello@kompliant.co.uk