Site induction template for contractors (UK): what to cover

Last updated 16 November 2026 · Sources last checked 16 November 2026

A site induction tells contractors' operatives what they need to know to work safely on your premises: how to sign in, the site rules, the hazards, where they can and can't go, and what to do in an emergency. The law requires you to give people working on your premises information about the risks and to make sure they know who runs the evacuation. A good induction does that in ten minutes, and checks it was understood.

What the law asks you to tell visiting workers

  • Risks and measures. A host employer must give the contractor's employer understandable information about the risks to their workers from the host's operations, and the measures taken. Anyone who is not your employee but works on your premises must get appropriate instructions and understandable information about those risks (Management Regulations 1999, regulation 12).
  • Evacuation. You must give enough information for the contractor to identify the person you have nominated to run evacuation, and take reasonable steps to make sure their workers can identify that person (regulation 12(4)).
  • Shared workplaces. Where you and the contractor share the workplace, you must co-operate, co-ordinate, and tell each other about risks from your own work (regulation 11).
  • Construction sites. On a project under CDM 2015, the principal contractor must make sure a suitable site induction is provided (CDM 2015, regulation 13).

HSE's guide to managing contractors says contractors need to know the site hazards, site rules, emergency procedures, the alarm and the PPE required, suggests standard materials such as cards, notices or videos, and recommends checking understanding and having contractors sign to confirm they will follow the rules (HSE, HSG159).

A structure to copy

  1. Welcome and who it's for. The site or sites it covers, and that everyone working on site must complete it before their first visit.
  2. Signing in and out. Where to report in and out of hours, who the site contact is, and having the permit reference ready.
  3. Permits and working areas. Work only in the area and at the times your permit covers. Which work always needs a permit.
  4. Site rules. Fire exits and escape routes kept clear, barriers around work areas, no smoking, vehicles and deliveries, working near staff or the public, keys and alarms.
  5. Known hazards. Asbestos (where the register is, and to check it before disturbing any part of the building), fragile roofs, isolation points, plant rooms, confined spaces, anything specific to the site.
  6. Emergencies. The fire alarm, the assembly point, who runs evacuation, first aid, and calling 999.
  7. Welfare. Toilets, water, where to take breaks.
  8. Reporting. Accidents, near misses and damage, to whom and before leaving site.
  9. Check and confirm. A short quiz on what matters most, and a declaration that they have read it and will follow the rules.

Checking it was understood

  • Ask, don't assume. A signature shows someone was there, not that they took it in. A few questions on the things that matter most (where the assembly point is, what to do before lifting a ceiling tile) shows they did.
  • Set a pass mark. Show the right answer when someone gets one wrong, and let them try again.
  • Decide how long it lasts. Many sites ask contractors to redo the induction every 12 months, and whenever the induction changes significantly.
  • Keep the record. Who completed which induction, when, and their score.

Common mistakes

  • One long document nobody reads. Keep it short and specific to the site.
  • The same induction for every site. Assembly points, hazards and sign-in arrangements differ; use a general induction plus site-specific details.
  • Done on the day, in the car park. Send it before the visit so it isn't rushed.
  • No record. If something goes wrong, you can't show who was inducted.
  • Out of date. The first aider left, the assembly point moved, the asbestos was removed.

How Kompliant Estates handles this

In Kompliant Estates, each site (or your whole estate) has an induction. Kompliant can draft it from the site's own details: the asbestos register location, isolation points, assembly point and hazards. It also writes a short quiz for you to check and edit. Every operative a contractor names on a work request gets their own link and completes it on their phone; wrong answers show the right one; a pass is recorded with an expiry date; and the permit can't be issued until everyone named has passed. Kompliant Estates is in early access.

Questions

Is a site induction a legal requirement?

You must give people working on your premises information about the risks and make sure they can identify who runs the evacuation (Management Regulations, regulation 12). On a CDM construction project, the principal contractor must provide a suitable site induction (regulation 13). An induction is the usual way to do both.

How long should a site induction take?

As long as it needs to cover the site rules, hazards and emergency arrangements clearly. For most retail, office and school sites, ten to fifteen minutes is typical. Keep it specific to the site.

Should contractors redo the induction?

Set a validity period (12 months is common) and ask people to redo it when the induction changes significantly, for example a new assembly point or a change to the asbestos information.

Does a quiz prove they understood it?

It doesn't prove it, but it is much better evidence than a signature alone, and it focuses people on what matters. Pair it with a declaration that they will follow the rules.

Who is responsible for inducting a contractor's workers?

The site owner provides the information about the site. The contractor remains responsible for their own workers' training for the task. On a construction project, the principal contractor provides the site induction.